M-13.1, r. 1 - Regulation respecting petroleum, natural gas and underground reservoirs

Full text
46. The daily report under section 45 shall contain all the information collected concerning operations carried out while drilling the well, in particular:
(1)  spudding date and date of the end of drilling;
(2)  the name of the drilling contractor;
(3)  depths reached at the beginning and end of each shift;
(4)  the time spent by the drilling crew on different operations related to drilling operations;
(5)  the type, dimensions and weight of the casing and its setting depth;
(6)  the quantity and rate of drilling mud lost in the well;
(7)  a summary of the working condition of the blowout prevention equipment;
(8)  the type of pump used and its capacity;
(9)  properties and volumes of mud used;
(10)  components used to assemble the drill strings;
(11)  the weight applied to the bit and its speed of rotation;
(12)  results of all deviation and directional surveys;
(13)  the type of cement used for cementation of each casing, giving its density, the nature of its additive and the quantity used;
(14)  mention of any trace of gas, oil or water in the well;
(15)  results of pressure tests;
(16)  the reasons for the loss of any casing or other equipment in the well together with a description of fishing operations;
(17)  a description of the well closing procedure used, where drilling is stopped temporarily or permanently;
(18)  the following information concerning the conditions of the drilling unit operations, where drilling is in a water-covered area:
(a)  name of the drilling unit;
(b)  number of persons aboard;
(c)  variations in temperature during the day;
(d)  wind velocity and direction;
(e)  height, interval and direction of wavers and swell;
(f)  visibility in kilometres;
(g)  the roll, pitch and vertical movement in the case of an offshore drilling unit;
(h)  dimensions, distance and direction of any icebergs.
O.C. 1539-88, s. 46; O.C. 1381-2009, s. 24.